17 July 2014

Updates

Early this morning we had a quick drop by our site to take out the red lid bin before the bin truck comes to dump and also have a look at the completed driveway. T.N Carpentry came shortly after and he's going to work on the concrete slab on the left side at the back. Decking possibly starts on the weekends.

Things are moving pretty quick than expected. Electrical was completed last night after a three whole day. Craig the electrician did a fabulous job with our electrical and very happy with his professionalism and service. Though he could not install the Antenna on the roof as he was not comfortable drilling through the tiles (he has not done previously) but was pleased he did not do what he was not comfortable with. Now that all the additional down lights are in it looks quite bright when turning on the lights. Luckily we have installed the dimmable switches in Master Suite, Media and the Alfresco which we just need to dim when we need the room to be dimmer. We may need to change the down lights in the Media room to a lower wattage as we wanted the room to be dimmed to nearly dark just like the cinema :)

Carpet Call did install the 'correct' carpet on Monday and glad we made the right colour choice on the carpet. We supposed to have a different carpet at the Media but end up making all rooms the same carpet just in case the other carpet doesn't fit in (colour wise).


Schedule

Interior:

Paint feature walls - Pending
Install timber flooring to main area - Half completed. On hold due to Electrician was on site.
Install carpets to bedrooms and Media - Completed
Install additional lights points around the house - Completed
Install security screens/doors and blinds - Scheduled by Friday 25th July
Install blinds and curtains - Pending
Install kitchen appliances - oven, dishwasher, fridge, washing machine, dryer - Pending
Install Laundry and WIR cabinet - Pending for quote



Exterior:

Fix the damaged fence at back  - Pending
Driveway - Completed
Turf - front and back - Scheduled for Monday -Friday
Timber decking - porch and alfresco -  Scheduled for Monday -Friday
Concrete - back left side - Starting today
Pebbles - back right side -  Completed
Retaining wall and garden bed at back -  Starting today
Side gates -  Scheduled for Monday -Friday
Paint feature colour at porch piers - Pending



Photos from last Monday's big day for all tradesmen...







Backyard is flatten


Excavator on the job


Pebbles poured on the right side


T.N Carpentry on the job


Cutting the footpath


Took them a few times to break this concrete

Carpet Call


Underlay installed


Carpet installed



Craig the electrician on the job


Electrician tools


All boxed up ready for pouring