The WIR light point has now moved to the correct position and toilet suite at Ensuite is also installed. With the discrepancy of the splash back colour Andy will meet with Colour Manager on site today to compare the two samples - one with old name one with new name - that she have and will advise us what is going to happen. Apparently, there was a name changed after our colour selection last year hence there was a colour difference. On the good side, Plantation Homes will be sending us a cheque to replace the damaged fence which we going to have it fixed in the coming weekends.
From the outside the temporary fence, bin and the ugly site toilet has been removed. Our weeds at the front also got removed and that going to save us time to remove it on the weekends.
Just a couple of things left tomorrow before the handover on Thursday. Getting very very close now and we are very excited :))
- Install gas bottle - PENDING
- Electrician to move the ceiling light point at WIR to centre - COMPLETED
- Andy to advise about the glass splashback - PENDING
- Andy to advise about the dent on the fence - COMPLETED
- Install the last toilet suite - COMPLETED
- Install exhaust fan at PDR - PENDING
- Install window corner frame at front - COMPLETED
- Install skylight at Media -PENDING
- Install missing laminate piece at microwave - PENDING
- Install missing laminate frame under kitchen cupboard - COMPLETED
Bin removed |
Temporary fence and ugly site toilet removed |
Weeds at the front removed |
Window aluminium corner frame now installed |
Metal mesh thing was sticking out before but now fixed |
Future driveway |
Laminate trim to be installed at Microwave area |
At last, toilet installed at Ensuite |