17 June 2014

Quick inspection with site supervisor

This morning we met up with our site supervisor, Andy, to inspect around the house as we have a few questions. So Andy advised most of our concerns will be addressed at the final building inspection that's when they go around the house and check every corner if there is something needs to be fixed it will be fixed at the inspection. And about our Master Suite door got delayed until now was because wrong door height was delivered so they had to send it back and apparently these doors were from Melbourne so it took sometimes to get new door in.

Walked around the house did not see a lot was done. Shower and bath mixers got installed at Ensuite and the bathroom only has the bath mixer installed . Still pending for shower screens, vanity basins, shelves and toilet seats to be installed. These will be done by Stegbar and they are booked on 26 June if I heard it right. One of the subcontractor who drilled a hole into the wall tile to install the shower mixer at the bathroom he actually cracked the tile and wrote 'sorry' for the tiler (lol). Well, here come the tiler again :)

So finally our kitchen and ensuite/bathroom caesar stone bench top got installed but guess what!? Our kitchen island cabinet was made at incorrect height!!! Yes, INCORRECT HEIGHT! It was hard to tell when the kitchen cabinet installed until the caesar stone bench top go in then you can immediately see the island bench top is a lot higher than the rear bench top. Approx 30mm difference in height. Apparently, this was the cabinet maker error that they did not refer to the amended drawing that Plantation Home sent and went with the original drawing. So now they have to rip the cabinet apart (keep the island bench top of course) and install new cabinet. On the good side, Andy assured this will not delay our handover date on 3rd July :)

A couple of more photos will be added shortly.


Ensuite shower mixer installed

Caesar stone bench top installed. Pending for vanity basins and mixers

Bath mixer installed. The mixer is a bit long and stick out a bit :(

And finally Master Suite door installed (unpainted)

Garage door installed. The door will be adjusted to touch the ground once electricity is installed.

Roller door installed

Scratched marks on door frame at Garage

Laundry sink and mixer installed

Toilet seats and towel rails to be installed

Semi recessed at Powder room installed. Pending for mixer

Caesar stone island bench and rear bench installed

As you can see the island bench is higher than the rear bench (!!)

Caesar stone rear bench installed

Posh kitchen sink installed (upgraded). Pending for mixer

1 comment:


  1. As the leading Natural Stone Supplier of an extensive range of Marble tiles and slabs, Marble Sinks, Travertine Tiles and slabs, Limestone Tiles, and other premium natural stone products in Australia, Euro Natural Stone strives to offer its customers the stone of unrivalled beauty and rarity at the best possible prices.