07 June 2014

And finally painting has completed!


Though it has been frustratingly slow but gladly to say the external and internal painting has now completed after an almost 2 weeks. We are happy how the colours turns out especially with the render facade as the first coat looked a bit 'pinkish' but now it looks much better. 

Our front door also got installed and stained. The only door left yet to be installed is our Master Suite. Not sure what is the delay to have this installed.

Not much of a progress other than receiving a text from Origin advising our LPG solar hot water bottle is scheduled to be delivered on Tuesday.

Yesterday, we shoot an email to our administration mentioning a few things we noticed while inspecting the house. Nothing major just things such as alfresco door not locking probably (the frame might be made incorrectly), door to garage makes squeaky sound when opening/closing, paint chips on gutter at front, a metal mesh thing stick out at top of render porch, electrician poked a hole at Laundry to install the light switch at WRONG HEIGHT (higher than all other light switches), etc. So hopefully these get fixed before the handover.

Now back to the waiting game for the followings to be installed:
  1. Painting internal walls - COMPLETED
  2. Install island bench, shelves to WIL and WIR - PENDING
  3. Install Master Suite door - PENDING
  4. Install front entrance door and stain to rich chocolate - COMPLETED
  5. Install kitchen and laundry sink - PENDING
  6. Install shower screens, bath tubs and vanities - PENDING
  7. Install kitchen and bathroom taps/shower head - PENDING
  8. Install fly screens to windows - PENDING
  9. Install light switches, powerpoints and lights - PENDING
  10. Install ducted air conditioning - PENDING
  11. Install garage door and roller door - PENDING
  12. Install solar hot water bottle - PENDING
  13. Install gas bottles - PENDING

Photos now includes completed tiling :))


Front door installed (unstained)



Front door now stained

Master Suite

Living


Ensuite with extended mirror (upgrade)

Ensuite (love the sea-shell mosaic!)

Bathroom mosaic (happy with this mosaic as well)

Bathroom

Bathroom

Bathroom



Looking out to the front door


Kitchen sink delivered a few days ago but not yet installed


Metal mesh sticking out


Paint chips on gutter


No comments: