15 March 2014

The slab is poured!

Just after morning tea we pop out to our land for a sneak peak while the guys pouring the concrete slab. We caught a couple photos in action but came back in the afternoon for better shots. So now we wait close to a week for the slab to settle then the next step will be putting up the house frames. We got advised the frames will be up by next Friday! Woohoo! But the downside is the next invoice for the Base Stage will be on its way to us soon :(


Sneak peak of the concrete truck

Sneak peak. Slab been poured already!!

Completes slab. Looking at the garage and front door
Looking across front door and master suite
Behind side gate on the right. Slabs for solar hot water, gas bottle and air conditioning unit at far back
Facing bedrooms hallway. Bedrooms on the left and kitchen on the right of the hallway

Looking at the Alfresco and Living room from the backyard. Going to be timber bi fold doors at the alfresco :))
Looking at the dinning room and alfresco
Left side of the house from backyard. Going to be a roller door as a drive through garage (but only motorcyle can go through lol)









No comments:

Post a Comment

Feel free to leave any comment :))