11 March 2014

All boxed up and ready for the concrete slab

And finally all boxed up ready for the concrete to be poured. It has been a bit of a rain so this delayed until today.

Well so far so good. No additional cost to any of the work being carried out so far. Hopefully it stays like this until the hand over. Fingers crossed :))

Getting excited for the concrete to be poured soon then frames will be up! :) Woot woot


Looking straight at front door


Looking across to the right facing front door and master suite


Reinforcement steel installed for the two piers at the front

Garage


Close up of garage


Looking towards to front from the back


Looking at the afresco


Looking at the living room and laundry


And so they installed reinforcement steel in those 3 deep holes









No comments:

Post a Comment

Feel free to leave any comment :))