| Sneak peak of the concrete truck |
| Sneak peak. Slab been poured already!! |
| Completes slab. Looking at the garage and front door |
| Looking across front door and master suite |
| Behind side gate on the right. Slabs for solar hot water, gas bottle and air conditioning unit at far back |
| Facing bedrooms hallway. Bedrooms on the left and kitchen on the right of the hallway |
| Looking at the Alfresco and Living room from the backyard. Going to be timber bi fold doors at the alfresco :)) |
| Looking at the dinning room and alfresco |
| Left side of the house from backyard. Going to be a roller door as a drive through garage (but only motorcyle can go through lol) |
No comments:
Post a Comment
Feel free to leave any comment :))