15 April 2014

Minor works being done..

Last week has been incredibly slow due to the wet weather. We thought Plantation might be doing the brick walls because some days were sunny but they didn't. At least they done the followings though:
  • Gas pipe lines
  • Plumbing pipe lines
  • Flexible aluminum foil air ducts for air conditioning
  • Electrical pre-wiring
  • Stuck some stuff on the windows and bi-fold doors so when they lock the doors we can't see anything inside from the outside
We drove past the site this afternoon to see if any work being done sadly nothing was done apart from seeing something large delivered and placed at the Garage. Our guess is the plaster walls so hopefully we will be seeing something tomorrow.


Plumber pipes for basin mixer


Electrical pre-wiring


Flexible aluminium foil air ducts for air conditioning




Plumbing pipes for kitchen sink, dishwasher etc


Cornice delivered

Gotta be the plaster walls!