23 May 2013

Plans sent to Head Office

After many hours re-designing and changes here and there we finally completed the plan and had it to what we want our house to be built. So these were sent to their head office which then going to take up to 4 weeks for the professional drawing and fixed price Tender to be completed then there will be a New Home Proposal meeting where we can do further changes (if require) before requesting the final contract and plans.


We originally chose the Retreat Series where the Master Suite at the back and the Alfresco in the middle at the back but we end up going with Aurora series to have the Master Suite at the front, not preferred but we would have a bigger room, and the Alfreso at the back on the left (preferrable).

Our facade is Miller (standard) but we added the Blake's entrance piers as an upgrade so our Facade is a mixed of the Miller and the Blake.

The bottom photos are from the display homes and our design/color themes are very similar to the photos except instead of tile floors we have timber floors to the main area.

Miller facade


Blake facade



Aurora Q2 standard floor plan










15 May 2013

Photos of green empty land

We just got back from our honeymoon just couple days ago and our land is now settled!! Whoooo!

The first photo is our empty land while the other neighbours getting their house built. Please ignore the little excited girl in the photo I would've removed her if I have photoshop program :)



Our lot 1


Lot 2 - neighbour on the right



Lot 3
 


Lot 5 - neighbour at the back