12 November 2013

Electrical meeting

Finally the last decision-making meeting - electrical meeting with Your Home Consulting. Prior attending this meeting we did a bit of shopping of all the electrical needs and drew a plan showing the additional downlights, pendants, outdoor lights etc. The lady consultant was great and very helpful. She went through each area and used the Viseo program to add the electrical needs to our plan. With bringing in our plan it helps the meeting run through very smoothly. With the quoted received a few days after we decided to outsource our electrical needs but have Plantation Homes to do the followings as it is easier to get them to do it than having our sub-contractor to do it after handover and it may cost even more:



  • 1 x Weatherproof Double Power Points
         Placing at the back on right for water tank to be installed in future
  • 2 x Junction Box for Future External Light Point 
         Placing at front two piers for up and down lights





01 November 2013

Our plans lodged with the Certifier Whoohooo

Pretty much for the last 3 months, we were going back and forth with Plantation Homes getting quotes, add/removing upgrades on the Tender and getting updated plan. Each time we requested a quote it took up to 2 weeks hence it took quite a bit of time to finalise the Tender.

So after all the upgrades we wanted are on the Tender and received the credits we ENTITLED (long storyyyy) we decided to sign the contract on 29 October!! Once signed, everything are locked in and if we want to make any adjustment there would be an administration fee of $500. Ouch!

1 November - And so our plans lodged with the Certifier! Usually, Council takes forever to approve the plans but hopefully we will get the approved plan back no longer than 4 weeks as Christmas is just around the corner (fingers crossed).

Here are the indicative timeline of what to expect until the pre site stage:

  • Plans lodged with Certifier to obtain Building Approval (4-8 weeks in Council)
  • Post Contract Variation Document (2-4 weeks)
  • Electrical Variation (2 weeks)
  • Approval Plans & Insurances emailed to bank to finalise finance (48 hours)
  • Final Drawings (1 week)
  • Final Pre Site Stage (2-3 weeks)

16 July 2013

First meeting with Head Office

And so we had to wait for this long to have this meeting and today was one of a hell full-on day:
  • New Home Proposal presenter from 9-12pm
  • Color Selection from 1pm-4pm

So at the New Home Proposal meeting we were excited to see how the professional plan turns out because from this we can see the exact measurement whereas when we hand drawn with a ruler the scale might be not as accurate. As we got excited to see the plan it turns out that they had the incorrect plan drawn! In the latest re-designed plan we had the fridge, WIL and the pantry in different area and so we had to go through with the presenter and had to hand drawn the plan again for a re-done. During this meeting we also made some slight changes:

Added:
  • 2 extra awning windows at Master Suites
  • Cavity sliding door to WIR in Master Suite
  • Bulk heads to Living and Media
  • Plaster niche to Entry and Dining
  • Tiled niches to Ensuite and Bathroom
  • Moved the windows positions in Bed 2 and 4

With these changes, it going to take couple of weeks for the plan to be re-done and so for an updated Tender to include the above extras.

For the Tender 1 presented to us today came to a figure that we thought it would be at our very maximum that we could spend. The standard building cost was actually increased by $6,500 since our first quote 3 months ago and with new price the air conditioning now included (instead of half price), 40mm grand island kitchen bench top (instead of 20mm) and also comes with a cold point connection to the fridge. Now we just going to take the Tender home to review and advise what we want to add or remove for the next Tender.

Color Selection Meeting - prior to this we visited Cosham Studio to see their range so we had some idea what we wanted. At the meeting she asked a much more detailed questions and gave us some advice which we never thought of so it assisted us to make the 'right' decision. The meeting goes for nearly 2 hours which was supposed to be 3 hours. We glad we came well prepared else we could have stayed for another hour. We added in a couple of upgrades just hope it won't be a massive increase to the Tender. The big day is over and here are the color selection we chosen.



23 May 2013

Plans sent to Head Office

After many hours re-designing and changes here and there we finally completed the plan and had it to what we want our house to be built. So these were sent to their head office which then going to take up to 4 weeks for the professional drawing and fixed price Tender to be completed then there will be a New Home Proposal meeting where we can do further changes (if require) before requesting the final contract and plans.


We originally chose the Retreat Series where the Master Suite at the back and the Alfresco in the middle at the back but we end up going with Aurora series to have the Master Suite at the front, not preferred but we would have a bigger room, and the Alfreso at the back on the left (preferrable).

Our facade is Miller (standard) but we added the Blake's entrance piers as an upgrade so our Facade is a mixed of the Miller and the Blake.

The bottom photos are from the display homes and our design/color themes are very similar to the photos except instead of tile floors we have timber floors to the main area.

Miller facade


Blake facade



Aurora Q2 standard floor plan










15 May 2013

Photos of green empty land

We just got back from our honeymoon just couple days ago and our land is now settled!! Whoooo!

The first photo is our empty land while the other neighbours getting their house built. Please ignore the little excited girl in the photo I would've removed her if I have photoshop program :)



Our lot 1


Lot 2 - neighbour on the right



Lot 3
 


Lot 5 - neighbour at the back

 
 
 
 
 
 

 

30 April 2013

Finance approved!! And got a date for land settlement

Today, we received an email from our Solicitor advising our finance is approved and the settlement will be on 15th May (3 days after we return to Brisbane). What a relieved because we were worried if we signed all required paperwork before we left although the bank manager was well organised and assured us everything they need are signed.

Couple of days ago our soil test report came back showing M class soil which is considerately good :)

Below is a list of soil class and it's description.


A - Mostly made up of sand and rock and has very little change when wet.

S - Slightly reactive clay in the soil with only slight movement due to moisture.
M - Moderately reactive clay with moderate movement due to moisture.
H - Highly reactive clay site with High ground movement.
E - Extremely reactive site with extreme movement due to moisture.
P - Soft soils, land slip, mine subsidence, etc. Collapsing soils due to moisture and soil structure changes.


Well, we're still in the US at the moment and had a great road trip from Los Angeles to Las Vegas in the Mustang for last 4 days and had an unforgettable birthday there now driving back to Los Angeles. Tomorrow we will be flying from Los Angeles to....NEW YORK!! Have seen a lot of movies filmed in New York City and now we going there to see it for ourselves. Someone told us NYC is bigger than Brisbane city which I thought to myself which City is not bigger than Brisbane? lol. 

I must say if you haven't visited Las Vegas highly recommend to visit and stay at Bellagio Hotel. The 4.5hrs road trip wasn't too bad (that was because I slept the whole way lol), saw a lot of nice scenes on the way. If we get to go there again I would do another road trip. 

Just a few photos from our Las Vegas trip.


Road trip to Las Vegas

Arrived at Las Vegas at last

Aahhh our lovely hotel - The Bellagio 
The fountain in front of our hotel at night. Truly magnificent 

A lovely gift for our honeymoon from the hotel. So sweet

12 April 2013

Land contract, deposit, soil test and honeymoon!!

As soon we decided to purchase the land we made the first deposit of $1000 with Plantation Homes so they can order the soil test and we got advised it could take up to 3 weeks for the soil test report to come back. We were OK with it as this time next week we will be on the plane heading to the USA for our belated honeymoon for 3 weeks (Woohoo!).

Next day - Saturday 13th April - an appointment with LJ Hooker to sign the land contract and o.m.g we actually signed the contract!! The moment we walked out the door it felt so unreal we just couldn't believe we signed the contract because we never thought we would build one day. I guess we had mixed feelings between excited and nervous :).

Well, the sale board below says it all - Lot 1 is SOLD. Yes, only 1 block left and that is Lot 4 with the easement. Lot 3 with the easement got sold shortly after we purchased our Lot 1 so the last Lot might get sold pretty quickly too. 

This going to be exciting and we definitely going to be busy in the next several months with all the planning and deciding. 