We have been quite busy since we got the handover. Trying to get quotes and organise tradesmen in to do the remaining work around the house so we can move in asap.
Yesterday, we have carpet call delivered the timber flooring and we have our own tradesman -
T.N Carpentry - on site to start the installation. We weren't there on site so we asked our tradesman to send a photo of the timber flooring to ensure it is the correct stock and it turns out to be the WRONG stock! The colour was completely different to the sample we received from the store though the same stock code UN0540 written on the box. We called Carpet Call immediately to check with their supplier and it turns out their supplier has packed the incorrect stock into box code UN0540 hence there was a colour discrepancy. O.M.G. So Carpet Call arranged the delivery man to exchange the stock immediately and this got sorted on the same day. Imagine we did not check with our tradesman and wrong stock got installed on the floor. Oh boy!
Today and tomorrow, T.N Carpentry continue on the timber flooring as carpet scheduled to be installed on Monday (by Carpet Call). Hopefully, they will have the correct carpet installed! Monday, we also have an electrician on site to install additional down lights and pendants around the house (due to complete within 3 days) and T.N Carpentry doing our driveway, concrete and landscaping (due to complete within a week hopefully). Will be a big day for all 3 tradesmen.
Schedule
Interior:
Paint feature walls
- Pending
Install timber flooring to main area -
Started. Due to complete by Monday
Install carpets to bedrooms and Media
- Scheduled for Monday
Install additional lights points around the house
- Scheduled for Monday-Wednesday
Install security screens/doors and blinds
- Scheduled by Friday 25th July
Install blinds and curtains
- Pending
Install kitchen appliances - oven, dishwasher, fridge, washing machine, dryer
- Pending
Install Laundry and WIR cabinet
- Pending for quote
Exterior:
Fix the damaged fence at back
- Pending
Driveway
- Scheduled for Monday -Friday
Turf - front and back -
Scheduled for Monday -Friday
Timber decking - porch and alfresco -
Scheduled for Monday -Friday
Concrete - back left side -
Scheduled for Monday -Friday
Pebbles - back right side - Scheduled for Monday -Friday
Retaining wall and garden bed at back -
Scheduled for Monday -Friday
Side gates -
Scheduled for Monday -Friday
Paint feature colour at porch piers -
Pending
Just a few photos of timber flooring today. More photos to come with flooring, lights and outdoor landscaping.
|
A nice Saturday morning |
|
Our lovely tradesman T.N Carpentry on the job |
|
Timber flooring delivery (correct stock) |
|
Entry nearly done |
|
Hallway |
|
Kitchen |
|
Bedroom hallway to be done before carpet can be installed on Monday |
|
Timber flooring for Living area |
|
T.N Carpentry on the job |
|
Incorrect timber flooring that got delivered. Got shocked when saw this. Thought that's how the timber we chose looks like. |
|
Of course the correct timber flooring is on the left and the incorrect timber flooring is on the right. Same timber but different colour |